Type 3 matoc helicopters
|
|
|
Author: EU is Date:
10/9/2023 7:36:54 PM +1/-1
Show Orig. Msg (this window) Or
In New Window
|
Exclusive Use - contract at a predetermined base location for a set guaranteed number of days
as compared to CWN - call when needed, no guaranteed number of days of work, no specific base location, operator responds out of their operating base (or wherever the aircraft is when the call comes in). |
|